The complete National Transportation Safety Board report on the deadly failure of an epoxy and anchor bolt concrete panel hanging system in the Central Artery Tunnel.
This report examines the leak problems in the Ted Williams Tunnel that were caused by defects in the slurry wall panel. Illustrated with drawings and photos.
The complete National Transportation Safety Board report on the deadly failure of an epoxy and anchor bolt concrete panel hanging system in the Central Artery Tunnel.