This 5-part series examines the engineering, machinery, soil conditions, and tight scheduling of London's Crossrail Project: an underground railway system (60 min).
The complete National Transportation Safety Board report on the deadly failure of an epoxy and anchor bolt concrete panel hanging system in the Central Artery Tunnel.